Investor Property Work Intake Checklist

A strong investor intake should collect enough information to answer four questions before anyone starts dispatching contractors:

Direct answer

A strong investor intake should collect enough information to answer four questions before anyone starts dispatching contractors:

  1. What outcome does the property need?
  2. What do we actually know about the current condition?
  3. What must still be verified before scope or pricing can be trusted?
  4. What constraints will affect execution, approvals, access, permits, or timing?

The checklist below is designed as a working intake artifact. It should produce a usable project record, not a pile of disconnected notes.


1. Property identity

  • ☐ Property address
  • ☐ Unit / building / suite if applicable
  • ☐ Ownership entity or investor name
  • ☐ Internal property ID if one exists
  • ☐ Property type
  • ☐ Approximate year built if known
  • ☐ Occupancy status: vacant / occupied / under contract / turnover / other
  • ☐ Current property-management contact if applicable
  • ☐ HOA / condo / association involvement if relevant
  • ☐ Gate, lockbox, key, or access notes

Notes:

____________________________________________________________


2. Why is work being considered now?

Choose the closest trigger.

  • ☐ Acquisition due diligence
  • ☐ Post-close rehab
  • ☐ Rental turnover
  • ☐ Active maintenance issue
  • ☐ Deferred-maintenance catch-up
  • ☐ Insurance / inspection follow-up
  • ☐ Preparing property for sale
  • ☐ Value-add improvement
  • ☐ Emergency / damage response
  • ☐ Portfolio-standard upgrade
  • ☐ Other

Describe the trigger in one sentence:

____________________________________________________________


3. Define the intended outcome

Avoid starting with a contractor category when the real need is an outcome.

Examples:

  • “Make this unit rent-ready to our portfolio standard.”
  • “Turn this inspection report into a contractor-ready rehab scope.”
  • “Stop the active leak, determine damage extent, and restore affected finishes.”
  • “Prepare the house for resale while keeping optional upgrades separate.”
  • “Replace recurring-failure components and document the new baseline.”

Required outcome:

____________________________________________________________

What would make the project clearly complete?

____________________________________________________________


4. Current-condition evidence

Check what is already available.

  • ☐ Inspection report
  • ☐ Seller disclosure
  • ☐ Property-manager report
  • ☐ Tenant report
  • ☐ Photos
  • ☐ Walkthrough video
  • ☐ Prior repair invoices
  • ☐ Prior scope of work
  • ☐ Prior contractor proposals
  • ☐ Permit / inspection records
  • ☐ Equipment model / serial information
  • ☐ Moisture / leak / diagnostic report
  • ☐ Engineering or specialist report
  • ☐ No meaningful evidence yet

Evidence links / file names / locations:

____________________________________________________________


5. Known conditions

List the conditions that are already sufficiently documented to become scope inputs.

Area / systemKnown conditionEvidence sourceInitial disposition
repair / replace / review / defer

Do not mix verified conditions with guesses.


6. Unknown or unresolved conditions

List anything that could materially change scope, price, schedule, or provider type.

UnknownWhy it mattersWhat would resolve it?Owner
photo / measurement / site visit / specialist

Examples:

  • extent of concealed water damage;
  • subfloor condition under failed finish;
  • electrical-panel condition requiring licensed review;
  • roof age or leak source;
  • HVAC repairability versus replacement;
  • exact flooring quantity;
  • permit history;
  • association approval requirement.

An intake is stronger when it preserves uncertainty instead of forcing every line into a fake fixed answer.


7. Work already believed to be in scope

Area / package 1

Location or system: ________________________________

Requested work: __________________________________

Known quantity / size: _____________________________

Material / finish standard: _________________________

Known exclusions: __________________________________

Open decisions: ____________________________________

Area / package 2

Location or system: ________________________________

Requested work: __________________________________

Known quantity / size: _____________________________

Material / finish standard: _________________________

Known exclusions: __________________________________

Open decisions: ____________________________________

Repeat as needed.


8. Existing contractors and preferred relationships

OttoServ should not assume every investor wants new vendors.

  • ☐ Investor has preferred GC
  • ☐ Investor has preferred handyman / maintenance provider
  • ☐ Investor has preferred electrician
  • ☐ Investor has preferred plumber
  • ☐ Investor has preferred HVAC contractor
  • ☐ Investor has preferred roofer
  • ☐ Investor has preferred cleaning / turnover team
  • ☐ Investor wants help filling gaps only
  • ☐ Investor wants a complete fulfillment path

Names / companies / contact notes:

____________________________________________________________


9. Regulatory and specialist flags

This section does not determine legal requirements. It tells the project team what needs verification.

  • ☐ Electrical work or concern
  • ☐ Plumbing work or concern
  • ☐ HVAC / mechanical work or concern
  • ☐ Roofing work or concern
  • ☐ Structural concern
  • ☐ Gas work or concern
  • ☐ Flood-zone / floodplain concern
  • ☐ Wind / opening-protection concern
  • ☐ Water intrusion / mold / indoor-environment concern
  • ☐ Association approval may be required
  • ☐ Permit may be required
  • ☐ Existing unpermitted work suspected
  • ☐ Jurisdiction has not yet been confirmed

Required follow-up:

____________________________________________________________


10. Schedule and access constraints

  • ☐ Closing date
  • ☐ Lease-end date
  • ☐ Target listing date
  • ☐ Target occupancy date
  • ☐ Property must remain occupied during work
  • ☐ Utilities are off
  • ☐ Limited access windows
  • ☐ HOA / building work-hour restrictions
  • ☐ Material lead time already known
  • ☐ Insurance / inspection deadline
  • ☐ Seasonal / storm consideration

Hard dates:

____________________________________________________________

Flexible dates:

____________________________________________________________


11. Budget framing

Do not turn a target budget into a claim that the scope can be completed for that amount.

Record separately:

Owner target / ceiling if one exists: ______________________

Known priced scope: ______________________________________

Allowances: ______________________________________________

Known unknowns: __________________________________________

Owner-held contingency: __________________________________

Items intentionally outside current budget: _______________

The project record should distinguish a planning target from verified pricing.


12. Approval rules

Define what can proceed without another phone call.

  • ☐ All changes require owner approval
  • ☐ Routine work within defined scope may proceed
  • ☐ Minor additional work may proceed below owner-defined threshold
  • ☐ Emergency property-protection work has separate authority
  • ☐ Material substitutions require approval
  • ☐ Schedule changes require approval if they affect target date
  • ☐ Hidden-condition work requires evidence before approval

Approval contacts:

____________________________________________________________

Escalation rule:

____________________________________________________________


13. Evidence expectations

Choose only evidence that will actually improve project control or property history.

  • ☐ Initial condition photos
  • ☐ Initial walkthrough video
  • ☐ Before-concealment evidence
  • ☐ Milestone photos
  • ☐ Change-condition evidence
  • ☐ Permit / inspection documents
  • ☐ Equipment labels / serial numbers
  • ☐ Final-condition photos
  • ☐ Final walkthrough video
  • ☐ Receipts / warranties / manuals
  • ☐ Deferred-condition record

Special evidence instructions:

____________________________________________________________


14. Closeout definition

Before work begins, decide what must exist at the end.

  • ☐ Scope reconciled to complete / deferred / excluded / changed
  • ☐ Punch items closed or explicitly accepted
  • ☐ Approved changes reconciled
  • ☐ Final condition evidence captured
  • ☐ Permit / inspection status documented if applicable
  • ☐ Equipment / warranty information retained
  • ☐ Access returned or reset
  • ☐ Final invoice / payment status reconciled
  • ☐ Deferred conditions have future trigger
  • ☐ Property history updated

Intake readiness test

Before moving from intake into pricing or dispatch, ask:

  • ☐ Can a reviewer explain the intended outcome in one sentence?
  • ☐ Are verified facts separated from assumptions?
  • ☐ Are important unknowns visible?
  • ☐ Is it clear what evidence is missing?
  • ☐ Is the likely execution path understandable?
  • ☐ Are regulated / specialist concerns flagged?
  • ☐ Are access and schedule constraints recorded?
  • ☐ Are owner approval rules known?
  • ☐ Is the next action explicit?

If several answers are no, the project is not ready to be treated as a clean contractor request.


What this tool should produce

A completed intake should hand off into one of four next states:

  1. Ready for scope development
  2. Needs additional evidence
  3. Needs specialist / regulated review
  4. Already defined well enough to begin pricing or execution planning

That state should be explicit.


How OttoServ fits

This is where a Services-first model starts to feel different from a lead form.

The useful intake is not:

name + phone + “what service do you need?”

It is:

property → outcome → condition → evidence → unknowns → scope → execution constraints → approvals → closeout standard

That structure gives OttoServ, the investor, contractors, and later AI/retrieval systems a shared project model instead of a paragraph that everyone interprets differently.